The Team

 

Peter HatherPeter Hather
Contracts Manager

 

Peter started in the construction industry in 1986 installing structural & passive fire protection for various companies across the UK; in 1989 he broadened his scope of works into the dry lining sector.

 

Peter then worked as a Contracts Supervisor for SR Cladding for 6 years; overseeing a variety of works including dry lining, fire protection, industrial roofing and cladding.

 

In 2002 Peter accepted a position as Contracts Manager with Total Fire Stopping where he remained for 3 years before returning to fixing.

 

He was then offered a position to supervise a fit out of Grand Arcade in Wigan for Sound Ceilings on a subcontract basis, as the contract was nearing an end Peter accepted a position to rejoin SR Cladding as a Contracts Manager; he continued to work there until returning to Sound Interiors as a Contracts Manager in 2009.

 

 

 

Howard Winter | Graham Flynn | Andy Langley
Mike Madden | Durwin Husbands | John Sheeran | Peter Hather

 

© Sound Interiors 2007 - 2012 all rights reserved | Privacy Policy | Terms & Conditions