Wigan Grand Arcade

 

Client: Modus
Main Contractor: Shepherd Construction Ltd
Value: £1.4 m
Architect: Leach Rhodes Walker Limited
Completed: April 2007

 

Scope of Works
Supply and installation of all the British Gypsum plasterboard, drylinings and GRG feature work to the shopping mall area, working to heights in excess of 14 m, utilising scissor lifts and cherry pickers including construction of pilasters and canopies. Working closely with the Main Contractor and Architect on detail design to a very tight programme over an 8 month period.

 

 

Testimonial

"On the Grand Arcade project the client had the beginnings of an idea of what they wanted the Mall to look like."

 

"Sound Interiors joined the project at this stage and provided a much needed practical input at this stage. They assisted with the co-ordinating and buildability detailing."

 

"Once the project moved on to site, Sound Interiors had a very demanding timescale to complete the works which involved integrating their works with many other trades working at high level and low level. The works were completed to a high quality standard, on time, which allowed the critical centre opening to be achieved as planned."

Association of Interior Specialists Gold Award Winner 2008


Derek Urquhart

Construction Manager, Shepherd Construction Ltd


Home
Company
Services
Clients
Team
Case Studies
Newsletter
Awards
Links
Contact
 

© Sound Interiors 2007 all rights reserved | Privacy Policy | Terms & Conditions